PROJECT MEETING (online mode)

Date:July 27, 2020, 10 a.m, Cisco Webex Platform

AGENDA

10.00 – 11.30 – Online Meeting speakers:

            Assoc. prof. phD. Eng. Coman Mirela –Project Coord. Manager

  • Opening speech

            Prof. phD. Eng., Adamenko Yaroslav -Project Manager

            Prof. phD. Pop Sitar PetricăVice-Rector UTCN-CUNBM

            Prof. phD. Eng., Mandryk Oleh -Vice-Rector of IFNTUOG

  • Opening speech on the INFTUOG

            Lect. phD. Demarcsek Ramona

  • Project implementation prospects in COVID-19 context- Romania-

            Lect. phD. Eng. Ștet Mihaela –Assist. project manager, Quality Assurance Manager (QAM)

  • State of procurement

Prof. phD. Eng., Adamenko Yaroslav, Kulyk Tetiana -Financial Manager

  • State of procurement

            Prof. phD. Eng., Arkhypova Liudmyla –Technical Expert

  • Development of the contents of the Laboratory Guidelines/Handbook

            Prof. phD. Eng., Adamenko Yaroslav –Project Manager

            Assoc. Prof. phD. Eng., Horgoș Mircea and Lung Claudiu –Technical Experts

  • Monitoring Plan-implementation

            IT Expert Taras Boichuk

  • Project web-site development and maintenance

            IT Expert Bogdan Cioruța

  • Project web-site development and maintenance

Interpreter: Stakhmych Yuliia (Ua) and lect. phD. Demarcsek Ramona (Ro)

Internal notification:

The activity is part of: AG6- A6.1 General project coordination, reporting, monitoring, project meetings

AG2-A2.1 Monitoring Campaign-Synthesis

According to the activities proposed by GAF, the monitoring activity is a nodal point of the project. The performances of the devices purchased for the CRIMIGE Center are thus tested, but the impact of the electricity production and distribution activities on the environment in the cross-border area is measured.

Within the project Time Plan, 3 monitoring campaigns were foreseen, distributed, as far as possible, in different seasons.

  1. The 1st stage – 4 months, June-September 2020, after the end of the equipment acquisition activity, the documentation and establishment of the itinerary period – the hot season, late summer-autumn is targeted.
  2. The 2nd stage – 3 months, December 2020-February 2021– the cold season is targeted.
  3. The 3rd stage – 3 months, April-June 2021 – an intermediary season is targeted, more precisely spring-early summer.

The following types of installations within the impact area:

•                      Level 1 -Euro-regional

•                      Level 2 – Regional-national with cross border impact

•                      Level 3 –Community level (local)

  • Electric stations (ST).

•          Electrical transmission networks / transmission lines (RET).

•          Power plants.

•          Broadcast relays for mobile telephony.

Biological systems

•                      Habitat investigations

                                   The vegetation cover/carpet

•                      Electric transmission networks / transmission lines (RET)

o                                 Species of avifauna interest”